Curious about what we’ve worked on?

Explore a selection of more than 500 projects across fixed and floating wind, marine innovations, oil and gas, and civil and dredging, demonstrating how we translate specialist engineering knowledge into practical solutions for complex offshore challenges.​

Our projects

Transition piece installation at East Anglia 2

Cadeler installed transition pieces on monopiles at the East Anglia 2 wind farm with a specialized lifting tool and a Huisman leg encircling crane. Mocean determined the dynamic amplification factor

Anode cage installation at East Anglia 2

Cadeler contracted Mocean to analyze the lowering of an anode cage onto a monopile at East Anglia 2, using a guide frame deployed from the monopile top. A transient dynamic

Hydraulic hose handling for a pile hammer

For Cadeler, Mocean gave design support for the deck handling of the hydraulic hoses and umbilical that ran to a pile hammer during monopile installation. OrcaFlex models of the deck

Four-point mooring analysis for anchor retrieval​

This project comprised the analysis of an anchor-loss incident on the North Sea during a diving operation and the evaluation of the four point mooring procedure. ​ During this project there was a high