Projects
LTE feasibility study for a Buoy
BP
Detailed analysis of CALM Buoy mooring fatigue and chain induced seabed scour impact analysis.
Mooring and motion analysis for HLV Gulliver
Scaldis
Mocean Offshore performed a mooring and motions analysis for HLV Gulliver during a decommissioning campaign.
Support of The Ocean Clean-up
The Ocean Clean-up
Mocean has supported the Ocean Cleanup's efforts for years. In the early years with design support and performance analysis of self-steering flexible plastic capture barrier in open sea. And in later stages workability assessments of the towed system.
Floating installation of Arcadis Ost 1 OWF
Heerema Marine Contractors
Arcadis Ost 1 is the first commercial offshore wind project using a floating installation method. Mocean helped Heerema Marine Contractors with turbine installation, lift analyses, and offshore support.
Quad lift for Hinkley Point
Scaldis
Detailed multi-body (3) heavy lift analysis involving a quad-crane-lift operation and fully coupled mooring response in extremely shallow water and high current conditions.
Kelp farm design
Kelp Blue
Mocean Offshore supported Kelp Blue to improve ocean health and absorb CO2 by evaluating a pilot farm's design near Namibia. They focused on durability in harsh weather and recommended redesigns to enhance safety and reduce costs.