Suction Bucket installation operability analysis​

The focus in this project was on accurately model the dynamics of the Suction Bucket Jacket (SBJ) during two critical installation phases: splash-zone crossing and landing onto the seabed. In addition, overall workability was evaluated.​ We developed detailed aero-/hydrodynamic models to simulate the SBJ’s descent through the splash zone, along with a coupled hydrodynamic and geotechnical model to […]

Floating installation of Arcadis Ost 1 OWF​

Arcadis Ost 1 is the first commercial offshore wind project installed with a floating installation method. Parkwind Ost GmbH contracted Heerema Marine Contractors (HMC) for the loadout, transport and installation of the WTGs. Mocean assisted HMC with the installation analysis.​ Mocean assisted HMC with wind turbine component lift analyses, determining design loads and expected motions for their novel full RNA lift method. […]

FOWT Platform design

Mocean supports maturing the design of a deep water floating wind platform for ECO TLP. The support includes floater design, improvements on the mooring system, overhaul of the installation methodology and development platform-specific cost modelling, as well as a scale-model test campaign performed at MARIN.​ Mocean leads the technical package for this innovative project, which has included responsibility for the process to receive […]

Mooring and motion analysis for HLV Gulliver​

Mocean Offshore performed a mooring and motions analysis for HLV Gulliver during a decommissioning campaign.​ ​Conduct mooring and motion analysis for Heavy Lift Vessel Gulliver during a decommissioning campaign. The scope entailed a mooring and motion analysis for a total of 13 lifts (topsides and jackets) during lift and transport operations. Results of the scope are workability tables for […]

Quad lift for Hinkley Point​

Detailed multi-body (3) heavy lift analysis involving a quad-crane-lift operation and fully coupled mooring response in extremely shallow water and high current conditions.​ As a part of the cooling system of a nuclear power plant; large concrete intake and outfall heads had to be installed on the seabed. The lift was performed by Scaldis with the Rambiz and Gulliver heavy lift vessels. […]