Quad lift for Hinkley Point​

Detailed multi-body (3) heavy lift analysis involving a quad-crane-lift operation and fully coupled mooring response in extremely shallow water and high current conditions.​ As a part of the cooling system of a nuclear power plant; large concrete intake and outfall heads had to be installed on the seabed. The lift was performed by Scaldis with the Rambiz and Gulliver heavy lift vessels. […]