Mocean determined the operability of lowering suction bucket jackets through the splash zone at the Greater Changhua offshore wind farm in Taiwan, from the installation vessel Aegir.
Time domain OrcaFlex simulations calculated the loads on structure and rigging while Hs, Tp, wave direction, current speed and seed were varied, including combined wave and current cases. Hoist wire offlead, dynamic amplification factor, grommet loads and vessel motions were checked against their limits. The result was a set of operability tables, in which the tugger line velocity limit was found to govern.